PKL ENGINEERING GUIDE · GD&T

Prepare the datum system before selecting the measurement path.

A controlled drawing, agreed datum reference frame and clear quality decision are the starting points for CMM programming—not the probe count.

PKL engineering illustration for dimensional inspection planning
01 / PREPARATION

Six items to confirm before programming.

This guide supports preparation only. The approved drawing, specified GD&T standard and the customer's quality authority remain controlling.

Drawing standard and revision

Identify the governing ASME or ISO convention and ensure all teams use the same controlled revision.

Datum reference frame

Confirm primary, secondary and tertiary datums and how the fixture will reproduce them without distortion.

Feature control frames

Review the symbol, tolerance zone, material-condition modifier and affected feature.

Access and stylus strategy

Check probe angle, stylus length, internal access, collision envelope and qualification needs.

Point or scanning density

Choose data density based on form, profile and the evidence needed—not a generic point count.

Report and disposition

Agree what the report must show and who decides pass, fail, rework or escalation.

CONTROLLED INPUT

Bring the drawing, CAD and quality question.

PKL will help structure the probe, fixture and measurement discussion around the real requirement.

Request an engineering review